Our services

Party Wall Surveying Services

Whether you're planning building works or have received a party wall notice, we provide expert, impartial advice and surveying services across London.

Building owner services

Acting for Building Owners

If you're planning works that fall under the Party Wall etc. Act 1996, you have legal obligations to your neighbours. We guide you through every step — from serving the correct notices to appointing a surveyor and agreeing an Award.

Works that require a party wall notice

  • Rear or side extensions
  • Loft conversions
  • Basement excavations
  • Structural alterations to a shared wall
  • New buildings at or astride the boundary
  • Excavations within 3–6 metres of a neighbouring structure

What we do for building owners

Party Wall Notices

We prepare and serve the correct statutory notices on your behalf, ensuring full legal compliance from the outset.

Schedules of Condition

A detailed photographic and written record of the adjoining property's condition before works begin, protecting you from unfounded claims.

Party Wall Awards

We negotiate and agree a Party Wall Award with the adjoining owner's surveyor, setting out the rights and obligations of both parties.

Ongoing Support

We remain available throughout your project to resolve any disputes or queries that arise during the works.

What we do for adjoining owners

Notice Review

We review the notice you've received and advise you on your rights and the best course of action.

Surveyor Appointment

We act as your appointed surveyor, representing your interests throughout the process at no cost to you — the building owner pays our fees.

Schedule of Condition

We carry out a thorough inspection and record the condition of your property before any works commence.

Award Negotiation

We negotiate the Party Wall Award to ensure your property is properly protected and any damage is addressed.

Adjoining owner services

Acting for Adjoining Owners

Received a party wall notice from your neighbour? You have rights under the Act and you don't have to face this alone. We act solely in your interest to ensure the proposed works are safe, properly documented, and that your property is protected.

As an adjoining owner, you are entitled to appoint your own surveyor and the building owner is responsible for paying their reasonable fees.

Get free advice

Party wall notices

Understanding Party Wall Notices

The Party Wall etc. Act 1996 requires building owners to serve specific notices before certain works can begin. There are three types of notice, each covering different types of work.

1

Party Structure Notice

Required for works to an existing party wall or party fence wall — such as cutting into the wall, raising its height, or underpinning it. Must be served at least two months before works begin.

2

Line of Junction Notice

Required when building a new wall at or astride the boundary between two properties. Must be served at least one month before works begin.

3

Notice of Adjacent Excavation

Required when excavating within 3 metres of a neighbouring structure to a depth lower than its foundations, or within 6 metres in more complicated scenarios involving deeper foundations such as piling or basements. Must be served at least one month before works begin.

Not sure where you stand?

We offer free initial advice with no obligation. Tell us about your project or the notice you've received and we'll explain exactly what needs to happen next.